Sign up & enjoy 20% off
Free shipping in Delhi/NCR
Welcome to V Aqua
India's Trusted Brand
5308+ Satisfied Customer
Call : 9560654995 / 7827654995
Flat 20% OFF
Previous
100 kld stp plant manufacturer

100 KLD Sewage Treatment Plant Manufacturer in India

2,274,000.00
Next

200 KLD Sewage Treatment Plant Manufacturer in India

3,545,000.00
200 KLD Sewage Treatment Plant Manufacturer in India

150 KLD Sewage Treatment Plant Manufacturer in India

2,950,000.00

V AQUA 150 KLD Sewage Treatment Plant is designed to treat approximately 150,000 litres of domestic wastewater per day. Ideal for apartments, hotels, hospitals, schools, housing societies, commercial buildings and industrial facilities, it offers efficient treatment, economical operation, easy maintenance and reliable performance.

Category: Brand:

Description

Introduction to 150 KLD Sewage Treatment Plant

A 150 KLD Sewage Treatment Plant (STP) is a wastewater treatment system designed to handle approximately 150,000 litres of domestic sewage per day under specified design and operating conditions. It is suitable for large residential communities, apartment complexes, hotels, resorts, hospitals, educational campuses, commercial buildings, institutional facilities, industrial campuses and other developments generating substantial quantities of domestic wastewater.

With increasing urbanization and growing pressure on freshwater resources, effective wastewater treatment has become an important part of modern infrastructure. Proper sewage treatment not only helps reduce environmental pollution but can also support water conservation through the reuse of appropriately treated wastewater.

A well-engineered 150 KLD STP plant can provide a structured process for collecting, treating, filtering and disinfecting domestic sewage. Depending on the selected treatment technology and the required treated-water quality, the treated water may be considered for suitable non-potable applications such as gardening, landscaping, toilet flushing and floor cleaning.

V AQUA WATER TREATMENT COMPANY provides water and wastewater treatment solutions for different capacities and applications, with plant configurations developed according to wastewater characteristics, project requirements, available space and intended treated-water management.

What Does 150 KLD Mean?

KLD stands for Kilolitres per Day.

Therefore:

  • 1 KLD = 1,000 litres per day
  • 100 KLD = 100,000 litres per day
  • 150 KLD = 150,000 litres per day
  • 150 KLD = 1.5 lakh litres per day

A 150 KLD sewage treatment plant has a nominal treatment capacity of approximately 150,000 litres of sewage per day.

However, selecting the correct plant capacity requires more than simply calculating the average daily wastewater generation. Proper engineering should consider:

  • Total occupancy
  • Daily water consumption
  • Sewage generation
  • Peak flow
  • Organic loading
  • Wastewater characteristics
  • Hydraulic retention requirements
  • Required treated-water quality
  • Reuse requirements
  • Future expansion
  • Available land and installation conditions

This assessment helps ensure that the STP is appropriately sized for the project.

Why Is a 150 KLD Sewage Treatment Plant Important?

Domestic sewage contains suspended solids, biodegradable organic matter, nutrients, microorganisms and other contaminants. Discharging untreated sewage can cause environmental pollution, odour problems and sanitation concerns.

A 150 KLD sewage treatment plant manufacturer designs the system to reduce these pollutants through a combination of physical, biological and tertiary treatment processes.

The major objectives of installing a 150 KLD STP include:

  • Treating domestic wastewater
  • Reducing the pollutant load
  • Improving wastewater management
  • Supporting environmental protection
  • Improving sanitation
  • Supporting water recycling
  • Reducing freshwater requirements
  • Providing a structured treated-water disposal or reuse route
  • Supporting applicable environmental requirements

For large facilities, an appropriately designed STP can become an important part of the site’s overall water-management infrastructure.

How Does a 150 KLD STP Plant Work?

The exact process configuration depends on the selected technology, wastewater characteristics and final treated-water requirements.

A typical 150 KLD STP can include several stages.

1. Inlet Screening

Raw sewage first enters the treatment system through a screening arrangement.

Large floating and suspended materials such as plastic, paper, cloth and other debris are removed at this stage.

Screening helps protect pumps, valves, pipelines and downstream treatment equipment.

2. Equalization of Sewage

Sewage generation varies during different periods of the day. An equalization tank can help balance variations in wastewater flow and pollutant loading.

This creates a more stable feed to the downstream biological treatment process.

3. Primary Treatment

Primary treatment is used to separate settleable solids and heavier suspended matter from incoming wastewater.

The exact equipment and arrangement depend on the selected STP process.

4. Biological Treatment

Biological treatment is a critical part of domestic sewage treatment.

Microorganisms consume biodegradable organic matter in wastewater, helping reduce the organic load.

Depending on the project, technologies such as the following can be considered:

  • MBBR
  • SBR
  • MBR
  • Activated Sludge Process
  • Extended Aeration
  • Other customized biological processes

The selection should be based on wastewater characteristics, available space, treatment objectives and operational requirements.

5. Secondary Clarification

After biological treatment, clarification can be used to separate biological solids from the treated wastewater.

Settled sludge can be returned to the biological treatment process where required, while excess sludge is removed for appropriate management.

6. Tertiary Filtration

Additional filtration can be incorporated when higher treated-water quality is required.

Possible treatment stages include:

  • Pressure Sand Filter
  • Activated Carbon Filter
  • Micron Filter
  • Ultrafiltration
  • Other polishing systems

The required filtration level depends on the intended application of the treated water.

7. Disinfection

Disinfection can be provided to reduce microbial contamination in treated wastewater.

Common options include:

  • Chlorination
  • Sodium hypochlorite dosing
  • UV disinfection

The selected system should be matched to the treatment objectives and applicable requirements.

8. Treated-Water Storage

After treatment, filtration and disinfection, treated water can be collected in a treated-water tank.

Depending on the final quality and applicable requirements, the water may then be routed toward an approved reuse, discharge or other designated management arrangement.

Applications of a 150 KLD Sewage Treatment Plant

A 150 KLD STP can be suitable for numerous large-scale applications.

Apartment Complexes

Large apartment developments generate wastewater from toilets, bathrooms, kitchens and common facilities.

A 150 KLD STP can be considered where the calculated domestic sewage generation approaches approximately 150,000 litres per day.

Housing Societies

Large housing societies can use centralized wastewater treatment to manage sewage generated by residents and common facilities.

Treated wastewater can potentially be reused for landscaping and other suitable non-potable purposes.

Hotels and Resorts

Hotels and resorts generate wastewater from guest rooms, restaurants, kitchens, laundry and other operations.

A properly designed STP can provide an on-site wastewater-management solution and support appropriate treated-water reuse.

Hospitals

Hospitals generate domestic sewage along with wastewater streams that may have specific characteristics.

The treatment system should therefore be designed according to the actual wastewater profile and applicable requirements.

Schools and Educational Campuses

Large schools, colleges and universities can generate significant wastewater from students, staff, hostels and other facilities.

A dedicated STP can provide an organized on-site treatment solution.

Commercial Buildings

Large offices, business parks, shopping complexes and commercial developments can require wastewater treatment where on-site treatment is necessary.

Industrial Campuses

Industrial facilities can generate both domestic sewage and industrial effluent.

These wastewater streams should be assessed separately. STP systems are primarily intended for domestic sewage, whereas industrial process effluent generally requires an ETP designed according to the specific industrial contaminants.

Benefits of a 150 KLD Sewage Treatment Plant

A properly designed and operated 150 KLD STP can provide several environmental and operational benefits.

Efficient Wastewater Management

The plant provides a dedicated treatment system capable of handling approximately 150,000 litres of domestic sewage per day under specified conditions.

Reduction of Pollution

Treatment helps reduce the pollutant load associated with untreated domestic wastewater.

Potential Water Reuse

Appropriately treated water can potentially be reused for suitable non-potable applications.

Freshwater Conservation

Reusing treated wastewater can reduce the requirement for freshwater in applications such as gardening and toilet flushing.

Improved Sanitation

Effective sewage treatment can help reduce problems associated with untreated wastewater, including odour and unhygienic discharge.

Centralized Wastewater Management

For large facilities, a centralized STP can simplify wastewater collection and treatment.

Automated Monitoring

Modern STPs can incorporate control panels, pumps, blowers, sensors and other instrumentation to support easier plant operation.

150 KLD STP Treatment Technologies

Different treatment technologies can be considered for a 150 KLD sewage treatment plant.

150 KLD MBBR Sewage Treatment Plant

Moving Bed Biofilm Reactor (MBBR) technology uses specialized carrier media that provide a surface for microorganisms.

Potential benefits include:

  • Compact biological treatment
  • Good biomass retention
  • Flexible operation
  • Efficient biological treatment
  • Suitable for many domestic sewage applications
  • Scalable configurations

MBBR can be considered for projects where compact biological treatment and practical operation are priorities.

150 KLD SBR Sewage Treatment Plant

Sequencing Batch Reactor (SBR) technology performs treatment stages sequentially.

A typical sequence includes:

  1. Filling
  2. Aeration
  3. Settling
  4. Decanting

SBR can be suitable for projects where automated batch treatment is appropriate.

150 KLD MBR Sewage Treatment Plant

Membrane Bioreactor (MBR) technology combines biological treatment with membrane filtration.

MBR can provide high-quality treated water and may be considered where stringent reuse requirements exist.

However, membrane systems generally require specialized operation, cleaning and maintenance.

Activated Sludge Process

The Activated Sludge Process uses microorganisms and aeration to reduce biodegradable organic matter.

It can be considered for various domestic sewage-treatment applications depending on project requirements.

Major Components of a 150 KLD STP

The exact equipment configuration depends on the selected treatment process. A typical system may include:

  • Inlet screening system
  • Collection/equalization tank
  • Sewage transfer pumps
  • Biological treatment tank
  • MBBR media where applicable
  • Air blowers
  • Fine bubble diffusers
  • Secondary clarifier
  • Sludge return arrangement where required
  • Pressure Sand Filter
  • Activated Carbon Filter
  • Micron filtration
  • Disinfection system
  • Treated-water tank
  • Sludge handling arrangement
  • Electrical control panel
  • Interconnecting piping
  • Valves
  • Flow meters
  • Instrumentation

The final equipment list should be prepared according to the process design and project requirements.

Prefabricated 150 KLD STP – A Practical Installation Approach

For suitable projects, a prefabricated STP can offer an alternative to extensive on-site tank and equipment construction.

In a prefabricated configuration, significant portions of the treatment unit can be manufactured and assembled before transportation to the project location.

This can help make on-site execution more focused on:

  • Foundation readiness
  • Unit placement
  • Alignment
  • Mechanical integration
  • Piping connections
  • Electrical connections
  • Testing
  • Commissioning

The suitability of a prefabricated design depends on site access, transportation limitations, foundation conditions, treatment capacity, process configuration and project requirements.

Installation & Project Execution of a Prefabricated STP

A structured installation methodology is important for successful STP commissioning. In a typical prefabricated STP project, execution progresses from site preparation to final trial operation.

The project can generally be divided into the following stages:

Execution Stage Description
Site Preparation The designated installation area is prepared, including the foundation or base required to support the prefabricated treatment unit.
STP Placement and Alignment The prefabricated unit is transported to the facility and carefully positioned, levelled and aligned at its designated location.
Mechanical Installation Major mechanical equipment associated with the treatment system is installed, connected and integrated with the prefabricated unit.
Piping Connections Inlet piping, internal/interconnecting pipework and treated-water outlet connections are completed according to the process arrangement.
Electrical Integration Power connections, control systems, electrical panels and equipment wiring are installed and integrated.
Testing and Commissioning Equipment, piping and electrical connections are inspected and tested, followed by trial operation and commissioning of the treatment system.

The prefabricated approach can reduce the amount of extended construction activity required at the installation site. Because substantial fabrication and assembly can be completed before transportation, site work can focus more heavily on placement, connections, integration, testing and commissioning.

This can be particularly useful for projects where construction time, site disruption and installation efficiency are important considerations.

Treated Water Management and Ground Discharge or Recharge

Treated-water management is an important part of any sewage treatment project.

The general treatment pathway can be represented as:

Raw Sewage → STP Treatment → Treated-Water Quality Monitoring → Designated Discharge/Reuse Arrangement

After sewage passes through the treatment process, the treated water should be monitored against the relevant quality requirements before being directed to its designated destination.

It is important to distinguish between ground discharge and groundwater recharge.

Ground discharge generally refers to the release of treated water to a designated location or area according to the applicable site arrangement and requirements.

Groundwater recharge, on the other hand, specifically refers to directing water into the ground with the objective of replenishing groundwater resources.

These terms should not be treated as interchangeable. The appropriate arrangement depends on:

  • Site conditions
  • Hydrogeological considerations
  • Applicable standards
  • Regulatory permissions
  • Water-quality requirements
  • Approved discharge or recharge infrastructure

Treatment through an STP does not automatically mean that treated water is suitable or approved for groundwater recharge. The final use or disposal route must be determined according to the designated site arrangement, water-quality monitoring and applicable permissions.

Key Principles for Treated-Water Management

A responsible treated-water management approach includes:

  • Treating sewage before any discharge
  • Monitoring treated-water quality
  • Routing treated water through the designated arrangement
  • Maintaining appropriate operational records
  • Following applicable discharge or reuse requirements
  • Obtaining necessary permissions where applicable
  • Evaluating recharge separately from conventional discharge

This approach helps ensure that treated wastewater is managed responsibly rather than simply transferred from one location to another.

Environmental Benefits of a 150 KLD STP Project

Installing a dedicated sewage treatment system can support several environmental objectives.

A properly operated STP can:

  • Reduce the risk of untreated sewage discharge
  • Lower the pollutant load associated with domestic wastewater
  • Improve wastewater-management practices
  • Support responsible water recycling
  • Reduce pressure on freshwater resources through appropriate reuse
  • Provide a more structured approach to treated-water management
  • Support environmental management objectives
  • Strengthen the wastewater-treatment infrastructure of a facility

For large facilities, wastewater treatment can therefore form an important component of broader environmental and resource-management practices.

150 KLD STP Plant Installation Requirements

Before installing a 150 KLD sewage treatment plant, the site should be evaluated carefully.

Space Availability

The required footprint depends on the selected technology, tank configuration and equipment arrangement.

Foundation

A suitable foundation or structural base is required for prefabricated and packaged STP systems.

Hydraulic Levels

Inlet and outlet levels should be reviewed to support efficient wastewater movement through the treatment process.

Electrical Infrastructure

Adequate electrical capacity should be available for:

  • Pumps
  • Blowers
  • Control panels
  • Dosing systems
  • Instrumentation

Accessibility

The plant should have adequate access for:

  • Operators
  • Inspection
  • Cleaning
  • Maintenance
  • Equipment replacement

Sludge Management

A suitable arrangement should be provided for periodic removal and appropriate management of excess sludge.

Ventilation and Odour Control

Proper ventilation and suitable odour-management measures should be considered, particularly where the STP is located near occupied areas.

150 KLD Sewage Treatment Plant Price in India

The 150 KLD sewage treatment plant price in India varies according to the treatment technology, construction method, equipment specifications and project scope.

There is no single fixed price for every 150 KLD STP.

The final cost may depend on:

  • Treatment technology
  • Tank construction material
  • Prefabricated or civil construction
  • Pumps
  • Blowers
  • Biological media
  • Filtration
  • Disinfection
  • Automation
  • Electrical panel
  • Instrumentation
  • Piping and valves
  • Civil work
  • Transportation
  • Installation
  • Commissioning
  • Treated-water quality requirements

STP Capacity Comparison

STP Capacity Approx. Daily Treatment Capacity Typical Applications
25 KLD 25,000 L/day Housing societies and institutions
30 KLD 30,000 L/day Apartments and hotels
50 KLD 50,000 L/day Large societies and commercial projects
75 KLD 75,000 L/day Hotels, institutions and societies
100 KLD 100,000 L/day Large campuses and developments
150 KLD 150,000 L/day Large societies, hotels, hospitals, campuses and industrial facilities
200 KLD 200,000 L/day Large townships and commercial developments

The table shows treatment-capacity categories rather than fixed selling prices. A detailed quotation should be prepared after evaluating the actual project requirements.

Factors Affecting 150 KLD STP Cost

Several factors influence the total investment required for a 150 KLD sewage treatment plant.

Technology Selection

MBBR, SBR, MBR and other treatment processes have different equipment, automation and operating requirements.

Construction Configuration

The plant may be constructed using different tank and equipment arrangements depending on the site.

Prefabricated vs Civil Construction

A prefabricated system and a fully civil-based treatment system can have different project costs and installation requirements.

Automation

The use of PLC, HMI, sensors, automated valves and monitoring systems can affect the overall investment.

Tertiary Treatment

Additional filtration, UF or other polishing processes can increase the plant scope.

Installation and Commissioning

Transportation, lifting, placement, piping, electrical work, testing and commissioning can contribute to the final installed cost.

Civil and Foundation Work

Foundation, excavation, RCC work and other civil requirements may be additional depending on the project.

Treated-Water Requirements

More demanding reuse or discharge requirements may require additional treatment stages.

For this reason, buyers should compare the complete technical scope, equipment specifications, installation responsibilities and operating requirements, rather than comparing only the headline price.

Why Choose V AQUA as a 150 KLD STP Manufacturer?

V AQUA WATER TREATMENT COMPANY provides water and wastewater treatment solutions for residential, commercial, institutional and industrial applications.

For a 150 KLD sewage treatment project, the system can be developed after considering:

  • Sewage generation
  • Peak flow
  • Wastewater characteristics
  • Available land
  • Treatment technology
  • Treated-water requirements
  • Reuse objectives
  • Automation requirements
  • Installation conditions
  • Maintenance requirements

The objective is to develop a practical treatment solution that balances treatment performance, operating cost, energy consumption, maintenance and project requirements.

V AQUA’s broader water and wastewater treatment solutions include:

  • Sewage Treatment Plants
  • Effluent Treatment Plants
  • Water Treatment Plants
  • RO Plants
  • Water Softeners
  • Ultrafiltration Systems
  • Wastewater recycling systems

How to Select the Best 150 KLD Sewage Treatment Plant Manufacturer in India

Selecting a manufacturer for a 150 KLD STP is an important decision because the plant is expected to operate as a long-term wastewater-management asset.

Evaluate Technical Experience

Review the manufacturer’s experience with similar STP capacities and applications.

Understand the Process Design

Ask the manufacturer to explain:

  • Treatment technology
  • Process flow
  • Hydraulic capacity
  • Biological treatment
  • Filtration
  • Disinfection
  • Sludge management

Compare Equipment Specifications

Important equipment should be compared based on actual specifications rather than brand names alone.

Review:

  • Pump capacity
  • Blower capacity
  • Biological media
  • Diffusers
  • Filters
  • Control panel
  • Electrical components
  • Valves
  • Piping
  • Instrumentation

Review Installation Scope

Clarify whether the quotation covers:

  • Transportation
  • Placement
  • Mechanical installation
  • Piping
  • Electrical work
  • Testing
  • Commissioning

Evaluate Operating Costs

Consider the ongoing costs associated with:

  • Electricity
  • Chemicals
  • Consumables
  • Sludge management
  • Preventive maintenance
  • Spare parts
  • Servicing

Check Technical Documentation

Depending on the project, request relevant documents such as:

  • Process flow diagram
  • General arrangement drawing
  • Equipment specifications
  • Operation and maintenance manual
  • Applicable material documentation
  • Testing and commissioning records

Operation and Maintenance of a 150 KLD STP

Regular operation and maintenance are essential for consistent treatment performance.

Typical activities can include:

  • Cleaning inlet screens
  • Inspecting sewage pumps
  • Checking blower operation
  • Monitoring aeration
  • Checking dissolved oxygen where applicable
  • Monitoring sludge levels
  • Cleaning filters
  • Inspecting valves
  • Checking pipelines
  • Inspecting electrical connections
  • Checking disinfection systems
  • Recording plant operating parameters
  • Periodic treated-water testing

The actual maintenance schedule should follow the manufacturer’s recommendations and the operating conditions of the facility.

150 KLD STP for Water Recycling and Reuse

A properly designed sewage treatment plant can help transform wastewater from a disposal challenge into a potential source of non-potable water.

A typical recycling pathway is:

Domestic Sewage → Screening → Equalization → Biological Treatment → Clarification → Filtration → Disinfection → Treated Water → Suitable Reuse

Potential applications include:

  • Gardening
  • Landscaping
  • Toilet flushing
  • Floor cleaning
  • Road washing
  • Other approved non-potable uses

The treatment level should be selected according to the intended reuse application and applicable water-quality requirements.

STP vs ETP – Understanding the Difference

STP and ETP systems are designed for different wastewater streams.

Parameter STP ETP
Full Form Sewage Treatment Plant Effluent Treatment Plant
Main Wastewater Domestic sewage Industrial effluent
Typical Sources Apartments, hotels, offices Factories and industrial processes
Treatment Design Domestic wastewater Industry-specific contaminants
Common Technologies MBBR, SBR, MBR, ASP Depends on industrial process
Main Objective Treat domestic sewage Treat industrial effluent

An industrial facility may generate both domestic sewage and industrial effluent. These streams should be evaluated separately to determine the appropriate treatment strategy.

Importance of Customized 150 KLD STP Design

A 150 KLD STP should not automatically be treated as a standard one-size-fits-all package.

Two facilities may have the same nominal capacity but significantly different operating conditions.

Important differences can include:

  • Wastewater characteristics
  • Peak flow
  • Occupancy pattern
  • Land availability
  • Treatment requirements
  • Reuse objectives
  • Electrical infrastructure
  • Installation constraints
  • Maintenance preferences

A customized engineering approach helps ensure that the treatment system is aligned with the actual project.

150 KLD Sewage Treatment Plant Manufacturer Across India

A 150 KLD STP can be considered for projects across major cities and regions in India, including:

  • Delhi
  • Noida
  • Greater Noida
  • Ghaziabad
  • Gurgaon
  • Faridabad
  • Jaipur
  • Lucknow
  • Chandigarh
  • Hyderabad
  • Mumbai
  • Pune
  • Chennai
  • Bengaluru
  • Ahmedabad
  • Surat
  • Indore
  • Jodhpur
  • Kolkata
  • Other cities and industrial locations

The final STP design should always be based on site-specific requirements and applicable local conditions.

Frequently Asked Questions About 150 KLD STP

What is a 150 KLD sewage treatment plant?

A 150 KLD sewage treatment plant is designed to treat approximately 150,000 litres of domestic sewage per day under its specified design conditions.

Where can a 150 KLD STP be used?

It can be used for large apartment complexes, housing societies, hotels, resorts, hospitals, schools, colleges, commercial buildings, institutional campuses and industrial facilities generating domestic sewage.

Which technology is suitable for a 150 KLD STP?

MBBR, SBR, MBR, Activated Sludge and other treatment technologies can be considered. The appropriate technology depends on wastewater characteristics, available space, treated-water requirements, budget and operating conditions.

Can a 150 KLD STP be prefabricated?

Yes, prefabricated or packaged configurations can be considered for suitable projects. The feasibility depends on transportation, site access, foundation requirements, plant configuration and project conditions.

Can treated water from a 150 KLD STP be reused?

Yes. Properly treated wastewater can potentially be reused for suitable non-potable applications such as gardening, landscaping and toilet flushing, subject to the required water quality and applicable requirements.

Can STP-treated water be used for groundwater recharge?

Not automatically. Groundwater recharge has specific technical, water-quality, site and regulatory considerations. The suitability and approval of recharge must be determined according to applicable requirements and site-specific permissions.

What is the price of a 150 KLD STP?

The price depends on treatment technology, construction method, equipment specifications, automation, filtration, disinfection, civil work, transportation, installation and other project-specific requirements.

Does V AQUA manufacture 150 KLD STP plants?

V AQUA WATER TREATMENT COMPANY provides sewage and wastewater treatment solutions for different capacities and applications. A project-specific technical configuration can be developed based on the required capacity and site conditions.

What is the difference between a 150 KLD STP and ETP?

A 150 KLD STP is primarily designed for domestic sewage, while an ETP is designed for industrial effluent. Industrial wastewater can contain specific contaminants requiring specialized treatment.

Conclusion – Choose a Reliable 150 KLD Sewage Treatment Plant Manufacturer

A 150 KLD Sewage Treatment Plant is a substantial wastewater-treatment solution designed to handle approximately 150,000 litres of domestic sewage per day. It can be suitable for large residential societies, apartment complexes, hotels, hospitals, educational campuses, commercial buildings, institutions and industrial facilities generating domestic wastewater.

The right STP should be selected based on actual sewage generation, peak flow, wastewater characteristics, treatment technology, available space, treated-water quality, energy consumption, maintenance requirements and final water-management objectives.

For projects using prefabricated STPs, structured execution can further simplify on-site work by shifting a significant portion of fabrication and assembly to the manufacturing stage. Site activities can then focus on foundation preparation, placement, mechanical integration, piping, electrical connections, testing and commissioning.

Treated-water management is equally important. Whether the final route involves reuse, designated ground discharge or an approved recharge arrangement, the system should be supported by appropriate quality monitoring and compliance with applicable requirements.

V AQUA WATER TREATMENT COMPANY provides water and wastewater treatment solutions designed around project-specific requirements, with a focus on practical engineering, quality-oriented components and reliable wastewater management.

If you are looking for a 150 KLD sewage treatment plant manufacturer in India, evaluate the complete technical proposal, treatment process, equipment specifications, installation scope, operating cost, maintenance requirements and after-sales support before finalizing the plant.

  • 150 KLD sewage treatment plant manufacturer
  • 150 KLD STP manufacturer in India
  • 150 KLD sewage treatment plant
  • 150 KLD STP plant
  • 150 KLD STP price
  • 150 KLD sewage treatment plant price
  • 150 KLD STP manufacturer
  • 150 KLD MBBR STP
  • 150 KLD SBR STP
  • 150 KLD MBR STP
  • prefabricated 150 KLD STP
  • packaged sewage treatment plant
  • sewage treatment plant manufacturer in India
  • sewage treatment plant supplier
  • STP plant manufacturer
  • domestic sewage treatment plant
  • commercial sewage treatment plant
  • wastewater treatment plant manufacturer
  • sewage treatment plant for apartments
  • sewage treatment plant for hotels
  • sewage treatment plant for hospitals
  • sewage treatment plant for housing societies
  • sewage treatment plant for townships
  • V AQUA STP plant

Shopping cart

2

Subtotal: 990,000.00

View cartCheckout

What Our Clients Say
3750 reviews